MRI_Removal

MRI Scanner Removed

MRI_RemovalGrant Mackay Company provided Selective Demolition so that a General Electric MRI scanner could be removed from the building. Grant Mackay Company opened the front of the pictured building and then successfully performed a complete Interior Demolition. There were Steel Walls that surrounded the MRI Scanner and all of the Steel was completely removed. In addition, there was Steel in the concrete floor and all the concrete had to be removed so that steel below could be extracted. All the demolition was done without disturbing the buildings frame, exterior or adjacent offices. Grant Mackay Company has a long history of all types of demolition requiring specialized knowledge, expertise and highly trained personnel.

Mark MitchellMRI Scanner Removed